Files
myfileagent-pipeline/documentation/devopsAIPromptLog.tex
T

42 lines
6.0 KiB
TeX
Raw Normal View History

\chapter{AI Prompt Log}
\ChapterLabel{AIPromptLog}
\markboth{AI Prompt Log}{AI Prompt Log}
\fancyhead[C]{\small AI Prompt Log}
\index{AI prompt log}
\section{Recorded Assistance}
\footnotesize
\begin{longtable}{L{2.8cm}L{5.0cm}L{7.0cm}}
\caption{AI assistance record}\label{Table:AIPromptLog}\\
\toprule
\textbf{Date / Version / Initials} & \textbf{Task} & \textbf{Human Review and Use} \\
\midrule
\endfirsthead
\toprule
\textbf{Date / Version / Initials} & \textbf{Task} & \textbf{Human Review and Use} \\
\midrule
\endhead
\bottomrule
\endlastfoot
October 7, 2026\\ 1.7.1\\ GDL, CDX & Continue final artifact verification at the user's request. & AI inspected rendered pages of the downloaded runs 7--8, verified the corrected architecture and evidence links, fixed an unnumbered history reference and registry label wrapping, and aligned the build guide with the tested pipeline. The title retains the user-requested October 6 date. Final publication is downloaded unchanged for submission review. \\
October 6, 2026\\ 1.7.1\\ GDL, CDX & Execute the approved full-source builds, controlled failure/repair, and evidence-based manual update. & AI ran and correlated successful runs 3--4, deliberate LaTeX failure 5, repaired run 6 and downloaded artifacts. PDF parsing/checksums verified identity; rendered chapter review identified and corrected overlapping diagram labels. The team retains responsibility for final submission review. No secret values entered the report or source; Chapter 4 was not implemented. \\
October 6, 2026\\ 1.7.1\\ GDL, CDX & Continue the user-authorized remote implementation using the supplied source ZIP. & AI performed the live preflight, registered the runner, built the pinned compiler image, diagnosed the initial runner memory limit, and downloaded the successful compatibility artifact. The user supplied the original manual and images. Manual source builds and failure/repair evidence follow separately; final human submission review remains with the team. \\
October 6, 2026\\ 1.7.1\\ GDL, CDX & Read the instruction PDF and existing manual; prepare the approved Chapter 3 Gitea Actions implementation. & The user clarified Chapter 3, approved implementation, selected Assignment 5/version 1.7.1/October 6, and identified \texttt{hw4\_images}. AI corrected source paths and metadata and prepared build identity and documentation. The original local SSH access is blocked; the user approved a separate remote implementation chat. Build-helper metadata and clean-copy checks passed locally; no runner, remote workflow, successful build, or failure/repair evidence is claimed. \\
September 29, 2026\\ 1.6.1\\ NK, GDL, CDX & Complete and review the public-domain, HTTPS, evidence, recovery, and reference material for Assignment 4. & The team supplied the domain and renewal facts, verified DNS, HTTPS, certificate automation and external ports, and approved the backup/restore exercise. AI assisted with diagnostics, isolated recovery evidence, requirement auditing, live links, security explanations, concise credential and reference updates, figure-flow improvements, compilation, and visual review. \\
September 26, 2026\\ 1.6.0\\ NK, GDL, CDX & Implement and document the MyFileAgent Gitea startup foundation while preserving the earlier grading services. & The team selected the accounts, approved changes, completed the repository workflow, ran verification commands, and supplied evidence. With permission, AI assisted with pinned Gitea/SQLite, persistent volumes, key-only SSH, and the Cloud Firewall while preserving ports 5050 and 8080 and documenting the instructor-cleared SSH exception. \\
September 18, 2026\\ 1.5.1\\ NK, GDL, CDX & Develop and integrate Chapter 8, the Project Proposal, for the MyFileAgent one-click DevSecOps pipeline. & The team supplied the project direction and selected tools. AI assisted with organizing the proposal, defining a limited demonstration task, and presenting the planned installation, build, configuration, testing, deployment, security, and Grafana monitoring workflow. The team reviews and approves the final proposal. \\
September 18, 2026\\ 1.5.0\\ NK, GDL, CDX & Document the DigitalOcean Droplet and Docker installation, website deployment, class-based JavaScript button design and UML diagram in Chapter 6, and the TeX Live Docker build, run, and verification workflow in Chapter 7. & The team supplied the requirements, deployment evidence, commands, and project files. AI assisted with LaTeX organization, code presentation, UML preparation, compilation, and layout review. The team reviews the material and verifies all commands and live deployment results. \\ \pagebreak
September 12, 2026\\ 1.4.1\\ NK, GDL, CDX & Update Section 3.2 with the human-run command outputs, include Hosts and Passwords, reduce and link the glossary, and verify index links. & AI suggested Linux commands to run and assisted with document organization and LaTeX editing. The team verified the commands before running them, made changes as needed, ran the commands, and gathered the outputs. AI did not execute the commands or produce the recorded terminal outputs. \\
September 11, 2026\\ 1.4.0\\ NK, GDL, CDX & Organize the Assignment 2 LaTeX report, integrate the supplied Linux-command chapter and problem-set chapter, and verify document layout and navigation. & The team supplied the assignment materials and terminal record, reviewed the generated text, and entered each problem set command into the terminal and manually verified the results. \\
\end{longtable}
\normalsize
\section{Evidence Boundary}
AI assistance was used for document organization, LaTeX authoring, code and
diagram presentation, proposal drafting, and layout review. Earlier Linux and website exercise outputs retain their original human-gathered
attribution. Later infrastructure assistance is identified in the dated entries
above. Assignment 5 remote execution is AI-assisted and recorded in the dated entries. Earlier preparation entries describe the state at that time, not the final implementation.
\clearpage
\fancyhead[C]{\small\nouppercase{\leftmark}}